Malahat Forest Estates

Malahat Forest Estates

You’ll find Malahat Forest Estates on a picturesque mountain above the Malahat (HWY 1) on Vancouver Island. The first phase of the development is for 18 homes, three of which are acreages. In total, 84 new homes planned for the development. MSR Solutions was brought in to assist with wastewater treatment and water treatment.

Ownership and operation of the utilities will be by the Cowichan Valley Regional District. (CVRD). The utilities have been commissioned and accepted by CVRD Operations. CVRD Engineering sign off for the removal of a No Build covenant was conditional on commissioning of the water and sewer utilities.

Wastewater Treatment

MSR Solutions reviewed the original design for Malahat Forest Estates and updated the design to include and service the first 18 homes.

  • MSR submitted a Sewerage System Regulation filing for the treatment and disposal system.
  • Supply and delivery of the mechanical components of the Membrane BioReactor (MBR) system was coordinated by MSR Solutions.
  • Three effluent disposal fields were constructed.
  • MSR Solutions conducted field reviews during installation of the treatment plant and disposal fields.
  • MSR Solutions conducted system testing, sensor calibration, and final commissioning.

Water Treatment

  • The water system had been substantially completed in 2014.
  • MSR tested and commissioned the system, including disinfection of the treatment and distribution systems, calibrating sensors, and programming the monitoring system.

Cottages on Osoyoos Lake, Oliver, BC

Cottages on Osoyoos Lake, Oliver, BC

Cottages on Osoyoos Lake is a 300-home residential development on Osoyoos Lake.

We were retained to design a water treatment plant and wastewater treatment plant co-housed in a single treatment building and obtained approval from Aboriginal Affairs and Northern Development Canada (AANDC). Wastewater works include screening, equalization, chemical nutrient removal and flat plate membranes from WesTech Engineering. Discharge is to rapid infiltration basins and subsurface drip irrigation. We provided construction oversight and commissioning support.

We continue to provide ongoing operation support.

See our Wastewater Treatment Services page for more information on what MSR Solutions can do for you.

Elkington Forest

Elkington Forest

Elkington Forest is a development located near Shawnigan Lake on Vancouver Island.

It is a phased development with the ultimate plan for 97 homes and 15 businesses to be constructed within a managed forest property. MSR Solutions provided design and construction inspection services for the first phase of the development. This included the access road to the development and servicing of the first 18 lots as per Ministry of Transportation and Infrastructure standards.

In commissioning phase for the water and wastewater treatment plants.