Millstream Industrial Park

Millstream Industrial Park

Multiple Projects

Millstream Industrial Park is a business and industrial complex located at the border of Langford and Millstream, BC on Millstream Road. MSR Solutions Inc. has been involved in various civil engineering projects in Millstream Industrial Park since 2014. The projects includes a wide range of topics.

MSR Solutions assisted with storm water management. MSR create flow structure design and construction admiration for Pond #1 as well as a flood analysis for Pond #2. Watermain expansion was one of the projects where we supplied design and construction administration.

The Millstream Industrial Park also need cross control locations at various locations on the site. MSR Solutions worked with the developer to achieve this. Storm water quality analysis and management was also needed on various locations throughout the site and included oil/water separators assessment as well as improvements

This is an ongoing project that MSR Solutions is proud to be a part of.

 


MSR has been our project engineer of choice since the early stages of the Millstream Industrial Park water line development. They helped ensure we were compliant with local bylaws and CRD Water standards in order to bring our private domestic water distribution system into our 70 acre industrial park. This private water system supplies domestic water to our clients. In addition, they’ve also engineered drainage and fire protection systems.
 
Working with MSR Solutions makes my job easier. They are readily available to discuss our current upgrades and needs. Everyone at MSR is friendly, professional and they give prompt service, which is very important in my industry. I highly recommend working with them.

Andy Wells – President – Millstream Industrial Park

 

Prince Rupert Airport

Prince Rupert Airport

Prince Rupert Airport

This project provided a rainwater harvesting system to meet the potable water needs of the Prince Rupert Airport.

The airport had identified the need to improve upon its current water supply from a lake intake, but alternative water sources were limited due to the airport being located on a small island. MSR Solutions conducted a source analysis and determined the optimal solution for that particular site is rainwater harvesting, with retention of the existing lake source as an emergency backup.

MSR Solutions designed the system for storage, treatment and conveyance of the rainwater as well as an improved treatment process for the lake water source, and obtained a permit through the health authority. Construction of the system is now complete. It is currently in the commissioning stage.

A unique aspect of this project is the use of rainwater harvesting within a larger commercial context, in contrast to typical rainwater systems which service single households.