Claydon Lane

Claydon Lane

Claydon Lane is a project located on the Sunshine Coast. The home is located on an ocean front property. A new five bedroom bedroom luxury home replaces the home they torn down.

The contractor, Green Vista Contracting, brought MSR Solutions to the project on behalf of the property owners. We helped design an on-site septic system to suit the new home. The current septic system had a single holding tank and no disposal field. To provide a more sustainable system, on-site treatment would need to be provided.

There is limited space on the Claydon Lane property due to the new property plans. The owners purchased a small strip of land with an existing disposal field from the neighbours on the uphill side of the property. This strip will act as the new disposal field area.  The project required extra review due to the property being narrow with areas of steep slopes and a close proximity to the ocean.  

MSR Solutions consulted with the client for decisions on the locations of the system and options for equipment to ensure a satisfied client.

Beachview Rise

Beachview Rise

Beachview Rise is a 20 lot subdivision located in the up-and-coming Port Renfrew on the west coast of Vancouver Island. Karl Ablack from Port Renfrew Management Inc. hired MSR Solutions to provide engineering design assistance for the development. The forest development is uphill from the Port San Juan. Some homes have a spectacular view of the ocean. Others have a relaxing view of a creek and the forest on the backside of the development. The fully serviced lots will each be bare ¼ acre single family lots. Buyers are able to build their dream home on their chosen property.

MSR Solutions coordinated with another consulting firm for the design of the civil works for each lot. We designed the lift station and wastewater treatment system with the intention of connecting other surrounding communities. This will create a large community wastewater treatment system in the future. Due to the future plan of a larger scale development, the current water reservoir upgrade was created as a joint project. The current reservoir is not large enough to support the future development as well as the town of Port Renfrew.  MSR Solutions coordinated with the Capital Regional District and Port Renfrew Management for upgrade of the water reservoir and the well located outside of town.

The MSR staff members on this project were: Mike Seymour (lead engineer), Arash Kanani (project engineer), and Matt Gable (drafting support).

MSR Solutions heard the client’s ideas for their future intentions for the system and provided a design to suit the large future community system.

We have worked with MSR Solutions on this project since 2016 with respect to sewer permitting with Sewerage System Regulations through the Ministry of Health. We have since taken a different approach and are now going through Municipal Waste Water Regulations through the Ministry of Environment. MSR Solutions helped us through the regulatory process with VIHA approval and continue to work with us on the MOE approval.

Karl Ablack, owner, Port Renfrew Management