Stormwater Management System for Fairway

Stormwater Management System for Fairway

MSR Solutions was first contacted by Canreal Management in January 2020. The loading dock at the Fairway market experienced prolonged flooding after three days of rain with approximately 44 mm of rainfall.

The market is located in the Langford Centre shopping plaza at 776 Goldstream Avenue in Langford, BC. The loading dock is at the end of Danbrook Avenue, on the north side of the shopping complex. It sits adjacent to Danbrook Park and acts as the low point to the surrounding catchment area.

After three days of downpour, it is assumed that some of the rain drained off adjacent roofs, driveways and the park and towards the driveway stormwater system. The stormwater system consisted of a catch basin, seepage basin, and infiltration chamber. The design could catchment area of approximately 600 m2.

Much Needed Stormwater Managemenet

MSR Solutions suggested a new stormwater system as a long-term solution to prevent frequent flooding events.

GRAF EcoBloc Stormater Management System

A new Type II Oil Interceptor and a EcoBloc Stormwater management system by GRAF offered an alternative to traditional gravel-based infiltration.  The system has square high-quality plastic units that are durable, 100% recyclable, and offer up to 97% reservoir volume (compared to 40% of gravel). MRS arranged the system in rectangular shapes and stacked them to maximize space on site.

MSR completed construction for this project which started at the end of October 2020. Full installation completed in November 2020.

Millstream Industrial Park

Millstream Industrial Park

Multiple Projects

Millstream Industrial Park is a business and industrial complex located at the border of Langford and Millstream, BC on Millstream Road. MSR Solutions Inc. has been involved in various civil engineering projects in Millstream Industrial Park since 2014. The projects includes a wide range of topics.

MSR Solutions assisted with storm water management. MSR create flow structure design and construction admiration for Pond #1 as well as a flood analysis for Pond #2. Watermain expansion was one of the projects where we supplied design and construction administration.

The Millstream Industrial Park also need cross control locations at various locations on the site. MSR Solutions worked with the developer to achieve this. Storm water quality analysis and management was also needed on various locations throughout the site and included oil/water separators assessment as well as improvements

This is an ongoing project that MSR Solutions is proud to be a part of.

 


MSR has been our project engineer of choice since the early stages of the Millstream Industrial Park water line development. They helped ensure we were compliant with local bylaws and CRD Water standards in order to bring our private domestic water distribution system into our 70 acre industrial park. This private water system supplies domestic water to our clients. In addition, they’ve also engineered drainage and fire protection systems.
 
Working with MSR Solutions makes my job easier. They are readily available to discuss our current upgrades and needs. Everyone at MSR is friendly, professional and they give prompt service, which is very important in my industry. I highly recommend working with them.

Andy Wells – President – Millstream Industrial Park

 

Port Renfrew CRD – Water System Upgrades

Port Renfrew CRD – Water System Upgrades

An ongoing project to upgrade the capacity of the water system in Port Renfrew, BC to allow for continued growth within the community.

The first phase of the Port Renfrew project involved upgrading the well pump, booster pumps and the associated piping and controls in order to increase the water supply available to the town. The second phase will involve upgrades to the town’s storage capacity by adding a second reservoir, providing increased water supply for fire protection and emergency storage.