MSR’s Latest Wastewater Treatment Initiatives

MSR’s Latest Wastewater Treatment Initiatives

Highly treated effluent as a beneficial discharge to wetlands | Registration Submitted

MSR Solutions has been busy as of late with the submission of Registration documents to the Ministry of Environment for discharge of highly treated effluent as a beneficial discharge to wetlands.  This method of discharge to the receiving environment falls under the beneficial water use aspects of the Municipal Wastewater Regulations (MWR) for discharges over 22,700 Litres/day.  This first registration is soon to be followed by a larger application which will see beneficial reuse to wetlands, as well as irrigation for food production and landscaping; reuse for toilet flushing; and for additional fire flow.  An added benefit is both the reduction in water demands from domestic water needs and surface water licenses, as well as using the water twice prior to returning it highly treated to provide environmental flows to the environment.  This requires a high quality secondary disinfected effluent, referred to as Class A effluent under the MWR, and will be partly achieved through the use of membrane technology, to which we have been designing into our treatment systems for over 20 years.

Small Water System Review | Qathet Regional District

MSR Solutions was recently awarded a project by the qathet Regional District to review a small water system in need of improvements and understanding of anticipated costs over the next 5-10 years.  The results of the report were well received and have been beneficial in understanding the unique needs of a small water system in a remote area.  As a result of the report, the qRD submitted a request for grant funding, which also required a water conservation plan.  MSR was retained to provide this on very short notice and with the support of staff to put in additional effort, we were able to deliver a strategy in support of water conservation which addressed the needs for this water system and provided the qRD with a road map for other small utilities. 

 

Replacement of aging water infrastructure | Duncan Strata

MSR Solutions has been retained by a strata in Duncan to support the replacement of their aging water infrastructure.  The first step is working in coordination with Coast Geotechnical and Skyline Structural Engineering to determine soil conditions and structural requirements for a new bolted steel tank reservoir.  The site has a steep slope near the site of the reservoir we need to maintain soil stability and slope setbacks as well as find creative and cost-effective solutions.

Lighthouse Pub

Lighthouse Pub

The Lighthouse Pub Project is located in the heart of Port Renfrew.    Developer, Jack Julseth, of Three Point Properties hired MSR Solutions Inc. for the job. This project encompasses the consolidation of three existing wastewater treatment systems into one. The Renfrew Pub, Seaside Cottages, and Lighthouse Pub will all tie into one system. The Renfrew Pub is where everyone from locals to hikers comes to enjoy a good bite to eat. The Pub has an extensive patio section where people can appreciate the view of Snuggery Cove.

Seaside Cottages

Just next door are the Seaside Cottages. The Seaside Cottages comprise 13 charming cottages that are right on the ocean. The cottages range from two bedroom units to studio units each with a patio to relish in the surrounding nature.

Rebuilding the Pub

The Lighthouse Pub is currently being built after the original pub burned in 2017. The new pub will house a 60 room hostel, and restaurant. It will also serve as a pick up location for outdoor sporting rental equipment. The Lighthouse Pub will be a budget accommodation option for tourist who want to explore all that Port Renfrew has to offer.

Project Filing

This project requires filing the product system under the Municipal Wastewater Regulation as the combined sewage loading exceeds the Sewerage System Regulation. A filing under the Municipal Wastewater Regulation requires extensive research and design to ensure the protection of the community and surrounding environment. An end date for the project is not in view as the project has encountered some complications.

 The MSR members on this project are Mike Seymour (lead engineer), Karl Williaume (project engineer) and Clare Robinson (drafting support).              

This has been a complicated project from the get-go. MSR Solutions has worked hard and continues to work on delivering an economical and robust system.

MSR Solutions developed a new method for a dam demolition which we needed done on a short timeline. We would not have completed the work on time without the interim solution that MSR Solutions provided for us. The Minister of Forests, Lands, Natural Resource Operations and Rural Development accepted the proposal and we were able to complete our project on time.

JP Martin, Three Point Properties