Within the past few years, MSR Solutions Inc. (MSRS) provided upgrade recommendations pertinent to Anmore Countryside Village wastewater and disposal systems. The recommendations were included: installation of equalization storage, UV disinfection units (for SPT2), and disposal field improvements. MSRS also assisted in the construction supervision and required inspections during the upgrade projects.
Further to the previous projects, MSRS has been retained by Countryside Village to register the existing wastewater and disposal systems with the BC Ministry of Environment and Climate Change Strategy (ENV) under the Municipal Wastewater Regulation (MWR).
Anmore Countryside Village consists of 92 lots with different type of dwellings. The available information in the BC Assessment portal (https://www.bcassessment.ca/) was used to identify the type and number of dwellings. In some cases, due to the absence of information in the portal, other resources such as available drawings and aerial photos were used to identify the type of dwellings.
The exiting wastewater treatment system at Anmore Countryside Village comprise two separate treatment and one disposal units SPT1 and SPT2. SPT1 and SPT2 were “Registered” and “Filed” with the BC Ministry of Environment and Climate Change Strategy (ENV) and Fraser Health Authority (FHA), respectively.
Client: Anmore Village Wastewater Treatment Registration and Upgrades
Location: Anmore, BC
Project Manager: Mike Seymour