We were retained to design a water treatment plant and wastewater treatment plant co-housed in a single treatment building and obtained approval from Aboriginal Affairs and Northern Development Canada (AANDC). Wastewater works include screening, equalization, chemical nutrient removal and flat plate membranes from WesTech Engineering. Discharge is to rapid infiltration basins and subsurface drip irrigation. We provided construction oversight and commissioning support.
Osprey Landing was an advanced secondary treatment system in an 81-home recreational development in Wardner, BC. The treatment plant included design and commissioning of Rapid Infiltration Basins. After construction of the treatment plant was completed, the development was put on hold.
Once the development resumed, MSR Solutions provided guidance for reinstating the system. We also provided commissioning services for the treatment plant and lift stations. Then MSR secured a Registration under the Municipal Wastewater Regulation. A unique aspect of this project was the ability to identify and implement an effective strategy for maximizing the value that could be retained from equipment that had been idle.