Stonebridge Land Development

Stonebridge Land Development

The Limona Group has obtained rezoning development approval for a 325-unit housing development on the property known as the Stonebridge Development. There will be additional development in the area including higher density and commercial density in the future. As a condition of the development, a community sewer system is to be provided which will be owned and operated by the Cowichan Valley Regional District (CVRD). The Limona Group has retained MSR Solutions to design and construct a community sewer system to serve the requirements for the development at build-out, to be built in stages. Limona has proposed to commence with initial 40-50 single family homes as the first stage of the development including Townhouse site and single-family homes on the south side of Shawnigan creek and single-family homes on the northern part of the property on the Shawnigan Mill Bay Road.

A design report was submitted to Limona by MSR Solutions in December 2014, which identified three stages to proceed to total build-out. Stage 1 Sewage Service Area was identified with minimal servicing requirements, with connection to the existing shopping centre Permit PE6503. Stage 2 Sewage Service Area was identified, based on an infrastructure funding application with the federal government. The areas identified within this stage of servicing included 325 Stonebridge single family equivalent homes, Pioneer Square shopping centre and any other areas based on capacity and determined by CVRD. A MWR application with the CVRD as the applicant was proposed for this stage of development. Stage 3 Sewage Service Area was identified to create a Town centre community sewer system including the Brulette Place sewer systems, the Stonebridge site, and surrounding developments.

It was proposed to provide a treatment plant that is modular and to which units could be added as the development progresses to first accommodate Stage 2 and then new development as capacity is available. Disposal was proposed to ground, within the Stonebridge property as well as in the Brulette area. The option of reclaimed water discharge to a constructed wetland with overflow to Shawnigan creek was identified following an Environmental Impact Study.

Project Manager: Mike Seymour
Client: The Limona Group
Location: Mill Bay, BC

Maracaibo Estates

Maracaibo Estates

Maracaibo Estates on Salt Spring Island

Maracaibo Estates on Saltspring Island currently has 85 strata owners and subdivided lots to add nine more additional small lots. MSR Solutions reviewed the capacity and water quality of the existing water system to ensure sufficient water quantity and quality of water to supply the new lots.  The design for water servicing a nine-lot subdivision met Island Health and Islands Trust requirements.  The subdivision is now complete.

Visit our Land Development Services page for more information.

664 Rockingham Road

664 Rockingham Road

664 Rockingham Road

664 Rockingham Road is a 5-lot subdivision. MSR Solutions provided Civil Site Servicing for the developer. The site was steep and rocky. The new access road had to accommodate two existing residential driveways with minimal disruption during construction.

MSR Solutions provided a Stormwater Management Plan and ensured Fire Access requirements were met.

MSR Solutions is proud to have been a part of this now complete project.

Elkington Forest

Elkington Forest

Elkington Forest is a development located near Shawnigan Lake on Vancouver Island.

It is a phased development with the ultimate plan for 97 homes and 15 businesses to be constructed within a managed forest property. MSR Solutions provided design and construction inspection services for the first phase of the development. This included the access road to the development and servicing of the first 18 lots as per Ministry of Transportation and Infrastructure standards.

In commissioning phase for the water and wastewater treatment plants.