Lighthouse Pub

Lighthouse Pub

The Lighthouse Pub Project is located in the heart of Port Renfrew.    Developer, Jack Julseth, of Three Point Properties hired MSR Solutions Inc. for the job. This project encompasses the consolidation of three existing wastewater treatment systems into one. The Renfrew Pub, Seaside Cottages, and Lighthouse Pub will all tie into one system. The Renfrew Pub is where everyone from locals to hikers comes to enjoy a good bite to eat. The Pub has an extensive patio section where people can appreciate the view of Snuggery Cove.

Seaside Cottages

Just next door are the Seaside Cottages. The Seaside Cottages comprise 13 charming cottages that are right on the ocean. The cottages range from two bedroom units to studio units each with a patio to relish in the surrounding nature.

Rebuilding the Pub

The Lighthouse Pub is currently being built after the original pub burned in 2017. The new pub will house a 60 room hostel, and restaurant. It will also serve as a pick up location for outdoor sporting rental equipment. The Lighthouse Pub will be a budget accommodation option for tourist who want to explore all that Port Renfrew has to offer.

Project Filing

This project requires filing the product system under the Municipal Wastewater Regulation as the combined sewage loading exceeds the Sewerage System Regulation. A filing under the Municipal Wastewater Regulation requires extensive research and design to ensure the protection of the community and surrounding environment. An end date for the project is not in view as the project has encountered some complications.

 The MSR members on this project are Mike Seymour (lead engineer), Karl Williaume (project engineer) and Clare Robinson (drafting support).              

This has been a complicated project from the get-go. MSR Solutions has worked hard and continues to work on delivering an economical and robust system.

MSR Solutions developed a new method for a dam demolition which we needed done on a short timeline. We would not have completed the work on time without the interim solution that MSR Solutions provided for us. The Minister of Forests, Lands, Natural Resource Operations and Rural Development accepted the proposal and we were able to complete our project on time.

JP Martin, Three Point Properties

Defiance Creek Dam Demolition

Defiance Creek Dam Demolition

Dam Removal

The Defiance Creek dam demolition plan involved full removal of the dam. MSR Solutions took into consideration the erosion concerns and the limited time window for the demolition works.

MSR Solutions proposed an interim solution to convert the Defiance Creek dam to a compound weir. This would allow for monitoring of debris around the channel. Monitoring of the weir continues until the weir is consolidated to form part of the channel. There is also a possibility of removal the following year (2019).

The construction works for the interim solution were completed successfully in September 2018. The interim approach was fully supported by FLNRORD. The project was completed on time and on budget.

See our Analysis and Consultation services page for more information on MSR Solutions services.

September 2018

Lodgepole Road

Lodgepole Road

The Lodgepole Road wastewater treatment plant is located in the Stonebridge Development in Mill Bay, BC. MSR Solutions is working with the Limona Group on this project.

MSR is developing and designing a new water system for this project. This water system will provide up to 150 units of water capacity for the future Stonebridge Development on Lodgepole Road.

We continue to work with Limona and the Mill Bay water district. The goal is to create conditions that makes use of smaller wells and smaller flows. These will combine to create development capacity for the entire Stonebridge Development.

Creative Solutions

MSR works closely with Limona to provide creative solutions in water capacity, for Stonebridge, as well as for the entire community of Mill Bay. When this project is complete, it will benefit the Stonebridge subdivision and also allow for the Lodgepole Road development of ten new units. This part of the project should be completed in late 2019.

October 2018

Cherry Point Marina

Cherry Point Marina

Cowichan Bay –  BC

MSR Solutions Inc. has completed a comprehensive study for Cherry Point Marina on possible wastewater treatment servicing options. The marina owner supports the two following options:

Onsite Treatment and Discharge to the CVRD Outfall

This proposed option offers an on-site package treatment plant and off-site disposal using the CVRD outfall. We propose a Class A treatment system for this option. Discharge to water bodies is allowed using the CVRD’s waste discharge authorization, with an amendment application. The connection to the outfall requires approval from the CVRD and MoE.

Influent Disposal to Lambourn WWTP through Neighbouring Property

In this option the marina wastewater treatment servicing is provided by the Lambourn WWTP. It will be via a new forcemain through the neighbouring property to the CVRD’s existing pump station. Approximately half of the forcemain will lie on the neighbouring property. Therefore the proposed forcemain will require support from the neighbouring property owner.

Salt Spring Island Ales

Salt Spring Island Ales

Salt Spring Island Ales

Salt Spring Island Ales brews a variety of beers from spring water collected on the forested hillside behind the brewery.  The brewing process includes several stages, and as much as possible, solids and highly concentrated wastes are side-streamed and diverted from the wastewater treatment process.

Wastewater that reaches the treatment process has very high concentrations of sugars, alcohol and yeast.  In terms of oxygen demand, brewery wastewater is about ten times more concentrated than typical domestic sewage.  One of the most challenging aspects is the wide variability in both the quantity and quality.  This is due primarily to the equipment cleaning regimen, which involves successive washings of strong acid, strong base and strong disinfectants. All of these have the potential to disrupt or kill the microorganisms that provide the biological treatment.  The current treatment process consists of equalization, aeration, sludge re-circulation, and sedimentation.  Treated effluent discharges to ground.

MSR Solutions is in the process of upgrading the wastewater treatment system of Salt Spring Island Ales to accommodate an increase in production.  The future wastewater treatment facility will include improved primary treatment. It will also take advantage of both anaerobic and aerobic zones to reduce effluent strength. It will do this while simultaneously minimizing the production of solid waste. Feedback control systems will balance the wide fluctuations in pH and flow rate.

Millstream Industrial Park

Millstream Industrial Park

Multiple Projects

Millstream Industrial Park is a business and industrial complex located at the border of Langford and Millstream, BC on Millstream Road. MSR Solutions Inc. has been involved in various civil engineering projects in Millstream Industrial Park since 2014. The projects includes a wide range of topics.

MSR Solutions assisted with storm water management. MSR create flow structure design and construction admiration for Pond #1 as well as a flood analysis for Pond #2. Watermain expansion was one of the projects where we supplied design and construction administration.

The Millstream Industrial Park also need cross control locations at various locations on the site. MSR Solutions worked with the developer to achieve this. Storm water quality analysis and management was also needed on various locations throughout the site and included oil/water separators assessment as well as improvements

This is an ongoing project that MSR Solutions is proud to be a part of.

 


MSR has been our project engineer of choice since the early stages of the Millstream Industrial Park water line development. They helped ensure we were compliant with local bylaws and CRD Water standards in order to bring our private domestic water distribution system into our 70 acre industrial park. This private water system supplies domestic water to our clients. In addition, they’ve also engineered drainage and fire protection systems.
 
Working with MSR Solutions makes my job easier. They are readily available to discuss our current upgrades and needs. Everyone at MSR is friendly, professional and they give prompt service, which is very important in my industry. I highly recommend working with them.

Andy Wells – President – Millstream Industrial Park