Salt Spring Island Ales

Salt Spring Island Ales

Salt Spring Island Ales

Salt Spring Island Ales brews a variety of beers from spring water collected on the forested hillside behind the brewery.  The brewing process includes several stages, and as much as possible, solids and highly concentrated wastes are side-streamed and diverted from the wastewater treatment process.

Wastewater that reaches the treatment process has very high concentrations of sugars, alcohol and yeast.  In terms of oxygen demand, brewery wastewater is about ten times more concentrated than typical domestic sewage.  One of the most challenging aspects is the wide variability in both the quantity and quality.  This is due primarily to the equipment cleaning regimen, which involves successive washings of strong acid, strong base and strong disinfectants. All of these have the potential to disrupt or kill the microorganisms that provide the biological treatment.  The current treatment process consists of equalization, aeration, sludge re-circulation, and sedimentation.  Treated effluent discharges to ground.

MSR Solutions is in the process of upgrading the wastewater treatment system of Salt Spring Island Ales to accommodate an increase in production.  The future wastewater treatment facility will include improved primary treatment. It will also take advantage of both anaerobic and aerobic zones to reduce effluent strength. It will do this while simultaneously minimizing the production of solid waste. Feedback control systems will balance the wide fluctuations in pH and flow rate.

Millstream Industrial Park

Millstream Industrial Park

Multiple Projects

Millstream Industrial Park is a business and industrial complex located at the border of Langford and Millstream, BC on Millstream Road. MSR Solutions Inc. has been involved in various civil engineering projects in Millstream Industrial Park since 2014. The projects includes a wide range of topics.

MSR Solutions assisted with storm water management. MSR create flow structure design and construction admiration for Pond #1 as well as a flood analysis for Pond #2. Watermain expansion was one of the projects where we supplied design and construction administration.

The Millstream Industrial Park also need cross control locations at various locations on the site. MSR Solutions worked with the developer to achieve this. Storm water quality analysis and management was also needed on various locations throughout the site and included oil/water separators assessment as well as improvements

This is an ongoing project that MSR Solutions is proud to be a part of.

 


MSR has been our project engineer of choice since the early stages of the Millstream Industrial Park water line development. They helped ensure we were compliant with local bylaws and CRD Water standards in order to bring our private domestic water distribution system into our 70 acre industrial park. This private water system supplies domestic water to our clients. In addition, they’ve also engineered drainage and fire protection systems.
 
Working with MSR Solutions makes my job easier. They are readily available to discuss our current upgrades and needs. Everyone at MSR is friendly, professional and they give prompt service, which is very important in my industry. I highly recommend working with them.

Andy Wells – President – Millstream Industrial Park

 

Beachview Rise

Beachview Rise

Beachview Rise is a 20 lot subdivision located in the up-and-coming Port Renfrew on the west coast of Vancouver Island. Karl Ablack from Port Renfrew Management Inc. hired MSR Solutions to provide engineering design assistance for the development. The forest development is uphill from the Port San Juan. Some homes have a spectacular view of the ocean. Others have a relaxing view of a creek and the forest on the backside of the development. The fully serviced lots will each be bare ¼ acre single family lots. Buyers are able to build their dream home on their chosen property.

MSR Solutions coordinated with another consulting firm for the design of the civil works for each lot. We designed the lift station and wastewater treatment system with the intention of connecting other surrounding communities. This will create a large community wastewater treatment system in the future. Due to the future plan of a larger scale development, the current water reservoir upgrade was created as a joint project. The current reservoir is not large enough to support the future development as well as the town of Port Renfrew.  MSR Solutions coordinated with the Capital Regional District and Port Renfrew Management for upgrade of the water reservoir and the well located outside of town.

The MSR staff members on this project were: Mike Seymour (lead engineer), Arash Kanani (project engineer), and Matt Gable (drafting support).

MSR Solutions heard the client’s ideas for their future intentions for the system and provided a design to suit the large future community system.

Beachview Rise, Water Table Study

We have worked with MSR Solutions on this project since 2016 with respect to sewer permitting with Sewerage System Regulations through the Ministry of Health. We have since taken a different approach and are now going through Municipal Waste Water Regulations through the Ministry of Environment. MSR Solutions helped us through the regulatory process with VIHA approval and continue to work with us on the MOE approval.

Karl Ablack, owner, Port Renfrew Management